For the complete documentation index, see llms.txt. This page is also available as Markdown.

Quick Start

Use this sequence when setting up Status Aging for the first time in a project.

1. Open Status Aging

Open the Jira project and select Status Aging.

If this is the first run for the project, choose a baseline before scanning.

First run baseline setup

2. Choose a Baseline

For most existing projects, choose Start fresh from today.

This prevents old active issues from becoming overdue immediately because they existed before the app was installed.

3. Review the Project Dashboard

After setup, review the summary cards and overview charts.

Project overview

Look first at:

  • Overdue count.

  • At Risk count.

  • Top bottleneck statuses.

  • Needs attention list.

4. Filter the Issue Table

Use filters to narrow the table to the issues you want to discuss.

Project filters

Common filters:

  • Alert level: Overdue.

  • Status: Code Review, QA, Blocked, or Waiting for Client.

  • Assignee: A specific user or Unassigned.

  • Search: Issue key or summary text.

5. Open a Flow Report

Open the row action menu and select Flow report.

Row actions menu

The Flow report shows the lifecycle path, status history, bottleneck, and export actions.

Flow report modal

6. Act on the Issue

Use the row actions or Flow report actions:

Action
Use when

Add comment

The issue needs a visible Jira update or owner response.

Snooze

The delay is known and should be checked again later.

Ignore

The issue should not be treated as a status aging problem.

Restore

An ignored issue should be monitored again.

7. Tune Settings

Open Settings and adjust thresholds, scan scope, and notifications.

Settings overview

Last updated